Ipswich: Prep-Work
S44 E17 April 6, 2023
Source:
Advertisement
Advertisement
Advertisement
Overview
Preparation for the new foundation begins. A centuries old cistern is uncovered. The original timber frame structure is assessed, and the original floorboards and roof sheathing are salvaged for later use. The sill is inspected for water damage.