123movies

Lexington: Reworked and Rewired

S45 E6 November 2, 2023 0h 27m
Source:
Advertisement
Advertisement
Advertisement

Overview

The fully framed front of the house is revealed; work continues on the geothermal system; the connection to the interior is made; blocking is installed in the framing; replacing and rewiring old receptacles.